This guide provides a step by step walkthrough to create a STC-Battery job using Greendeal
01
Introduction
02
Click "PVD Jobs"
03
Click "Create a PVD"
04
Click "STC - Battery"
Select the "STC - Battery" option
05
Choose "On-Grid" or "Off-Grid"
06
Fill in the national metering identifier (NMI)
If you choose "On-Grid", you need to fill in the national metering identifier (NMI)
07
Click "Your PO reference for this Job"
08
Fill in the text box with your installation address
09
Choose the building type, Single or Multi
10
Choose your battery installation type - "New"
Choose your battery installation type.
If you are installing a battery at this address for the first time, click "new"
11
Click "Replacement"
If all previous batteries components removed / decommissioned, click "replacement".
12
Click "Extension"
If you are installing a new battery in an existing system, choose the "Extension" option
13
Click "Additional"
If there are new separate system(s) at the same address, click on the "Additional" field
14
Fill in the kWh rating of existing batteries
And for Extension and Additional type, you need to fill in the kWh rating of existing batteries.
15
Choose the location for your installation
Choose the location for your installation, "Indoor" or "Outdoor"
16
Click "Yes"
Have solar panels been installed? If your worktype is STC-battery only, it must be "Yes".
17
Choose your battery & inverter integration type
Choose your battery & inverter integration type
18
Choose the property type
19
Select your owner type and fill in the information
20
Schedule your installation date, and make sure it's after "1/7/2025"
21
Choose your inverter if you need
22
Fill in the quantity of this inverter model
23
Select your Battery model
24
Tag "OSW"
You'll see the tag "OSW", this is a model available at OSW.
25
Quantity of Units
If the model you choose is multi units, tell us how many units in one model.
26
Fill in the quantity of this battery model
27
Click "VPP Capable"
Tell us if this model is "VPP-Capable". A battery is VPP capable if the inverter:
can connect to the electricity grid and external entities (directly or indirectly);
can communicate and respond through remote signals
28
Select your installer
29
Select your designer
30
Select your electrician
31
Upload your Attachments
You can upload your attachments here.
32
Click "Confirm"
33
Review and check your job
Review and check your job information, if everything is ready, click "Create Job"
This guide covered the steps to create a STC-Battery job in Greendeal.