Overview
BESS5 is a Battery Energy Storage System Activity under the NSW Battery Incentive and is designed primarily for Large Commercial and Industrial Battery Projects in NSW.
Typical projects may include:
Factories
Warehouses
Large Retail Facilities
Data Centres
Other large Commercial / Industrial sites
๐ BESS5 is a standalone Work Type and cannot be combined with STC or other BESS activities.
๐ Before You Start
Before creating a BESS5 Job, make sure:
NSW PRC Access has been enabled by an Admin User
PRC Training has been completed and the Training Status = Passed
The required company qualification documents have been uploaded
The Installer meets GreenDeal's applicable credential and PRC Eligibility requirements
For detailed setup instructions, see:
โ Create a BESS5 Job
Step 1 | Open Create a Job
Go to:
Retailer Portal โ PV/BAT Jobs โ Create a Job
๐ Step 2 | Select the BESS5 Work Type
Select: BESS5
๐ BESS5 is a standalone Work Type and cannot be combined with other Work Types.
๐ Step 3 | Complete the Summary
Enter the required Job Summary information as prompted.
๐ค Step 4 | Complete Owner Details
๐ Business Classification: Select the category from the dropdown that best matches the customer's primary business activity.
Make sure the information entered in GreenDeal is consistent with the actual project details and Supporting Documents.
๐ Step 5 | Enter the Installation Address and Site Attributes
The BESS5 Installation Address must be located in NSW.
Start typing the address and GreenDeal will automatically suggest matching addresses.
Review the information and update it where required based on the actual project.
๐ The Site Attributes displayed may vary depending on the project. Complete the fields shown in GreenDeal based on the actual installation.
๐ก PRC Tip
โก Step 6 | Complete System Information
GreenDeal will automatically display the NMI(s) associated with the Installation Address.
If multiple NMIs are found, select the correct NMI for the project, then complete the remaining System Information.
โ ๏ธ Follow any on-screen validation messages before continuing.
๐ Step 7 | Complete Job Schedule & Equipment Details
BESS5 supports two methods for entering equipment information.
Option 1 | Select from the System Library
GreenDeal will automatically populate or calculate the relevant Output / Capacity information based on the selected equipment and quantity.
Option 2 | Manual Input
If the equipment is not available in the GreenDeal equipment Library, click Request a device and enter the required equipment details manually.
๐ Make sure all manually entered equipment information matches the actual equipment being installed and the relevant Supporting Documents.
๐ท Step 8 | Select/Add the Installer
โ ๏ธ If you cannot select an Installer, check whether the required credentials, documents and PRC Eligibility requirements have been completed and remain valid.
๐ Step 9 | Upload Supporting Documents
Upload the Supporting Documents required for the BESS5 project.
For BESS5, pay particular attention to:
Electricity Bill
Applicable Commercial / Industrial Project Documents
UL9540A Test Certificate
๐ We recommend obtaining the applicable UL9540A Test Certificate from the Battery Manufacturer before lodging the Job.
For the full document requirements, see:
๐ฑ Complete Installer / On-Site Information
Once the BESS5 Job has been created, the Installer will need to complete the required on-site steps through the GreenDeal App.
These may include:
Confirming the Nomination Form has been completed before Installation Work Commences
Completing the required On-Site Selfies
Taking the required site and equipment photos
Entering Serial Numbers
Completing the required Checklist
Uploading Certificates and other required documents
For detailed Installer instructions, see:
โ๏ธ Complete the Nomination Form
For BESS5, the Nomination Form must be signed before any installation work commences.
โ ๏ธ If the Nomination Form is only signed after the installation has been completed, the PRC application will be invalid.
Once the required Nomination Form process is complete, the Installer can continue with the applicable on-site steps.
For detailed requirements, see:
09 | โ๏ธ Nomination Form Requirements
๐ Run Auto Check Before Lodging
Before lodging the Job, we recommend running GreenDeal Auto Check:
Identify missing or inconsistent information
Add or update Supporting Documents
Resolve potential compliance issues
For detailed instructions, see:
๐ Lodge the BESS5 Job
Once the required Job information, documents and Auto Check are complete, click Lodge PRC.
Select the applicable payment method, review the displayed price, then click Lodge & Settle.
After lodgement, the Job will enter GreenDeal Compliance Review.