A step-by-step guide to creating and lodging a standalone BESS5 Job for eligible large commercial and industrial battery projects in NSW using GreenDeal.

Written by service@greendeal.com.au

Overview

BESS5 is a Battery Energy Storage System Activity under the NSW Battery Incentive and is designed primarily for Large Commercial and Industrial Battery Projects in NSW.

Typical projects may include:

  • Factories

  • Warehouses

  • Large Retail Facilities

  • Data Centres

  • Other large Commercial / Industrial sites

๐Ÿ“Œ BESS5 is a standalone Work Type and cannot be combined with STC or other BESS activities.


๐Ÿ“‹ Before You Start

Before creating a BESS5 Job, make sure:

  • NSW PRC Access has been enabled by an Admin User

  • PRC Training has been completed and the Training Status = Passed

  • The required company qualification documents have been uploaded

  • The Installer meets GreenDeal's applicable credential and PRC Eligibility requirements

For detailed setup instructions, see:


โž• Create a BESS5 Job

Step 1 | Open Create a Job

Go to:

Retailer Portal โ†’ PV/BAT Jobs โ†’ Create a Job


๐Ÿ”‹ Step 2 | Select the BESS5 Work Type

Select: BESS5

๐Ÿ“Œ BESS5 is a standalone Work Type and cannot be combined with other Work Types.


๐Ÿ“ Step 3 | Complete the Summary

Enter the required Job Summary information as prompted.


๐Ÿ‘ค Step 4 | Complete Owner Details

๐Ÿ“Œ Business Classification: Select the category from the dropdown that best matches the customer's primary business activity.

Make sure the information entered in GreenDeal is consistent with the actual project details and Supporting Documents.


๐Ÿ“ Step 5 | Enter the Installation Address and Site Attributes

The BESS5 Installation Address must be located in NSW.

Start typing the address and GreenDeal will automatically suggest matching addresses.

Review the information and update it where required based on the actual project.

๐Ÿ“Œ The Site Attributes displayed may vary depending on the project. Complete the fields shown in GreenDeal based on the actual installation.

๐Ÿ’ก PRC Tip


โšก Step 6 | Complete System Information

GreenDeal will automatically display the NMI(s) associated with the Installation Address.

If multiple NMIs are found, select the correct NMI for the project, then complete the remaining System Information.

โš ๏ธ Follow any on-screen validation messages before continuing.


๐Ÿ”Œ Step 7 | Complete Job Schedule & Equipment Details

BESS5 supports two methods for entering equipment information.

Option 1 | Select from the System Library

GreenDeal will automatically populate or calculate the relevant Output / Capacity information based on the selected equipment and quantity.

Option 2 | Manual Input

If the equipment is not available in the GreenDeal equipment Library, click Request a device and enter the required equipment details manually.

๐Ÿ“Œ Make sure all manually entered equipment information matches the actual equipment being installed and the relevant Supporting Documents.


๐Ÿ‘ท Step 8 | Select/Add the Installer

โš ๏ธ If you cannot select an Installer, check whether the required credentials, documents and PRC Eligibility requirements have been completed and remain valid.


๐Ÿ“„ Step 9 | Upload Supporting Documents

Upload the Supporting Documents required for the BESS5 project.

For BESS5, pay particular attention to:

  • Electricity Bill

  • Applicable Commercial / Industrial Project Documents

  • UL9540A Test Certificate

๐Ÿ“Œ We recommend obtaining the applicable UL9540A Test Certificate from the Battery Manufacturer before lodging the Job.

For the full document requirements, see:


๐Ÿ“ฑ Complete Installer / On-Site Information

Once the BESS5 Job has been created, the Installer will need to complete the required on-site steps through the GreenDeal App.

These may include:

  • Confirming the Nomination Form has been completed before Installation Work Commences

  • Completing the required On-Site Selfies

  • Taking the required site and equipment photos

  • Entering Serial Numbers

  • Completing the required Checklist

  • Uploading Certificates and other required documents

For detailed Installer instructions, see:


โœ๏ธ Complete the Nomination Form

For BESS5, the Nomination Form must be signed before any installation work commences.

โš ๏ธ If the Nomination Form is only signed after the installation has been completed, the PRC application will be invalid.

Once the required Nomination Form process is complete, the Installer can continue with the applicable on-site steps.

For detailed requirements, see:

09 | โœ๏ธ Nomination Form Requirements


๐Ÿ” Run Auto Check Before Lodging

Before lodging the Job, we recommend running GreenDeal Auto Check:

  • Identify missing or inconsistent information

  • Add or update Supporting Documents

  • Resolve potential compliance issues

For detailed instructions, see:


๐Ÿš€ Lodge the BESS5 Job

Once the required Job information, documents and Auto Check are complete, click Lodge PRC.

Select the applicable payment method, review the displayed price, then click Lodge & Settle.

After lodgement, the Job will enter GreenDeal Compliance Review.


โžก๏ธ Whatโ€™s Next?