Overview

Supporting Document requirements may vary depending on the:

  • BESS Activity

  • Work Type Combination

  • Job Information

  • Whether PV is included

  • Other project-specific requirements

Use this guide to prepare the key Supporting Documents in advance.

๐Ÿ“Œ Always follow the current requirements displayed in GreenDeal and the latest Auto Check results for the specific Job.


๐Ÿ“‚ Common Supporting Documents

For BESS3, BESS4 and BESS5, commonly required Supporting Documents may include:

  • Nomination Form

  • Tax Invoice to Purchaser + Purchase Cost

  • Payment Evidence

  • DNSP Approval + Activity Date

  • Council Planning Approval

  • Installer Declaration

  • CCEW / Certificate-related Documents

  • Panel Invoice or CCEW โ€” where applicable

  • Other Supporting Documents required by GreenDeal

๐Ÿ“Œ Additional documents vary by BESS Activity and project type. See the comparison below.


๐Ÿ”‹ BESS Activity-Specific Documents

๐Ÿข BESS3

Pay particular attention to the Strata Plan and other applicable strata-related evidence.

๐Ÿช BESS4

Make sure the Electricity Bill and applicable Commercial Project Supporting Documents are available.

๐Ÿญ BESS5

The UL9540A Test Certificate is a key Supporting Document for BESS5.

๐Ÿ“Œ We recommend obtaining the applicable UL9540A Test Certificate from the Battery Manufacturer before lodging the Job.


๐Ÿ”‹ BESS2

BESS2 document requirements may vary depending on the Job and how the BESS2 Activity was created.

Depending on the project, prepare the applicable:

  • Nomination Form

  • Battery-related Documents

  • Installation-related Documents

  • Supporting Evidence

  • Installer-related Documents

  • Other documents required by GreenDeal

๐Ÿ“Œ Always follow the requirements displayed for the specific BESS2 Job.


โ˜€๏ธ Jobs with Solar Panels

Where Solar Panel information is included in the project, additional Supporting Documents may be required, such as:

  • Panel Invoice

  • CCEW

  • Other Solar-related Supporting Evidence

๐Ÿ“Œ Requirements depend on the BESS Activity, Work Type Combination and actual project information.


โ˜€๏ธ Jobs with Solar Panels

Where the Job includes new or existing Solar Panel information, additional Supporting Documents may be required.

These may include:

  • Panel Invoice

  • CCEW

  • Other Solar-related Supporting Evidence required by GreenDeal

๐Ÿ“Œ Requirements may vary depending on the BESS Activity, Work Type Combination and project information entered.

Always follow the Supporting Document requirements displayed for the specific Job.


โœ๏ธ Nomination Form

For BESS3, BESS4 and BESS5, the Nomination Form must be signed before any Installation Work Commences.

โš ๏ธ If the Nomination Form is only signed after the installation has been completed, the PRC application will be invalid.

For detailed requirements, see:


๐Ÿ” Review Auto Check Before Lodging

Once the required documents have been uploaded, run GreenDeal Auto Check.

Auto Check can help identify:

  • Missing Supporting Documents

  • Incomplete or inconsistent information

  • Outstanding Checklist Items

  • Missing Signatures

  • Other potential compliance risks

After making corrections, run Auto Check again before lodging.

For detailed instructions, see:


โœ… Before Lodging

๐Ÿ“Œ This document list is a preparation guide. Always follow the current requirements displayed in GreenDeal for the specific Job.